Brick Wall Estimator Wall Length (ft): Wall Breadth (ft): Wall Height (ft): Brick Length (mm): Brick Breadth (mm): Brick Height (mm): Cement : Sand Ratio (e.g., 1:6): : Calculate Results:
Read moreDetailed Study of Budhanilkantha-5, Tushal Landslide – Kathmandu
Topographic Survey of Landslide at Budhanilkantha-5, Tushal – Kathmandu Client: Government of Nepal, Ministry of Energy, Water Resources and Irrigation Department of Water Resources and Irrigation Vulnerable Landslide Management Project…
Read moreTopographic Survey of Adheri Khola and Girwari Khola Bridge Project – Nawalparasi
Client: JICA Contract with: Drone Nepal Rivers: Girwari River and Adheri River Project Area: Nawalparasi District District Year: 2075-2076
Read moreBagmati Sindhuli Section Road Survey of Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project
Detailed Survey of Bagmati Sindhuli Section Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project Client: DOR Contract By: Fullbright Consultancy Pvt. Ltd. Length: 60 km Project Area: Sindhuli District District…
Read moreTopographic Survey of Landslides- Prone Sections for JICA at BP Highway
Client: JICA Contract By: Soil Test Pvt. Ltd. Project Area: Sindhuli District District Year: 2074-2075
Read moreDetailed Engineering Survey, Design and Cost Estimate of Urthe-Pere-Chotra Road, Jumla
Detailed Engineering Survey, Design and Cost Estimate of Urthe-Pere-Chotra Road, Jumla (20KM) Client: Patrasi Rural Municipality,Dillichour, Jumla Contract By: Deuti Engineering Consultancy Length: 20.48 km Project Area: Jumla District District…
Read moreTopographic Survey of Land at UNITED CEMENT FACTORY
Client: UNITED CEMENT FACTORY Project Area: Dhading, Nepal Year: 2074-2075
Read moreDetailed Topographic Survey of Mewa-Tamor Dobhan Hydroelectric Project
Mewa-Tamor Dobhan Hydropower Project Client: Mewa Developers Pvt. Ltd. Development Region : Eastern Development Region Zone : Mechi District : Taplejung Location of Project Site : Lintep, Khoklin, Liwan VDCs…
Read moreNamuna Nepal Acess Road and Land Survey- Dhurmus Suntali Foundation
Namuna Nepal Land Survey- Nepal Bhitra ko Nepal – Dhurmus Suntali Foundation Client: Dhurum Suntali Foundation, Naya Baneshwor, Kathmandu Area: 2000 Ropani Project Area: Lele, Nepal Year: 2074-2075
Read moreTopographical Survey of Karnali stage-1 Hydroelectric Power Project
Topographical Survey of Karnali stage-1 Hydroelectric Power Project Client: ERMC Capacity: 570 MW Project Area: Karnali Year: 2074-2075
Read more