Skip to content
Back HomeBack Home

Best Surveying Engineers in NEPAL

Best Surveying Engineers in NEPAL

  • Home
  • Services
    • Topographic Surveys
    • Road Surveys
    • Hydro-power and Transmission Line Surveys
    • Mapping and Cad Solutions
    • Setting Out Services
    • Measured Building Surveys
  • About us
  • Gallery
  • Contact
  • Blogs
  • Projects
  • Social
  • Login
Home » Projects » Bagmati Sindhuli Section Road Survey of Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project

Bagmati Sindhuli Section Road Survey of Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project


Detailed Survey of Bagmati Sindhuli Section

Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project

  • Client: DOR
  • Contract By: Fullbright Consultancy Pvt. Ltd.
  • Length: 60 km
  • Project Area: Sindhuli District
  • District Year: 2074-2075

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to print (Opens in new window)

Related


Post navigation

  • ← Topographic Survey of Landslides- Prone Sections for JICA at BP Highway
  • Topographic Survey of Adheri Khola and Girwari Khola Bridge Project – Nawalparasi →

Speak to us Today

Call us to Discuss your requirement
Phone: +977-1-4910475, 9849875800
Email:[email protected]

  • Home
  • About us
  • Gallery
  • Services
  • Contact
  • Blogs
  • Login

Search Here

· © 2021 RRP Survey Consults Pvt. Ltd. · Developed By Pranish Shrestha ·